Skip to main content

Project List - Highways

Project Name Bid Number Project Number Project Location Project Description Bid Amount Lowest Bidder Completion Date
2017 Bridge Washing FA 5761.31-17 Various 249000 Hunting Valley
2018 Capital Overlay Contract A CAP - 141.294.313.580-2018 various Mill and Overlay $2,379,604.10 Destro and Brothers
2018 Capital Overlay Contract B CAP-161.189.550-18 Town of Tonawanda and Lancaster Mill and Overlay 1621667.57 Occhino Corp.
2018 Capital Overlay of Garrison Road - County Road 289 CAP-289-18 Town of Amherst Mill and Overlay 341842.75 Occhino Corp.
2018 Culvert Group 1 BR-MISC8-18 1169500 Edbauer
2018 Culvert Group 2 BR-MISC18-2018 various 1137926 Union Concrete Construction Corp.
2022 Storm Damage Restoration CAP-STORM2022 CAP-STORM2022
2023 Bridge Deck Overlays and Joint Repairs (5 Bridges) FA-5763.42-23 FA-5763.42-23
2023 Overlay A CAP-141.196.245-2023 CAP-141.196.245-2023
2023 Overlay B CAP-365.523-2023 CAP-365.523-2023
2024 Overlay A CAP-290.317.573-202 CAP-290.317.573-202
AKRON FALLS PARK - RETAINING WALL REHABILITATION AKRON-RW-18 Town of Akron 56900 Horizon
Back Creek Road (CR438) Slope Stabilization & Reconstruction CAP438-2023 Back Creek Rd Slope stabilization and full depth highway reconstruction including, new closed drainage and a relocated waterline. Project limits on Back Creek Road CR 438 extend from the intersection with Rice Hill Road to 400 feet north of the intersection in the Tow
Bridge Replacements for North French Road, CR299 (BIN3326760) and County Road, CR282 (BIN3326680) - (2) Bridges FA-5763.34-23 FA-5763.34-23
Colvin / Brighton Safety Improvements PIN 5760.97 Town of Tonawanda Intersection Improvements 479417.45 Occhino Corp.
Como Lake Low Level Outlet Replacement 245960 Hohl Industrial
Construction of Asphalt Snow Storage on East and West Road (CR 363) Between Orchard Park Road (NYS Route 240) and Union Road (NYS Route 277) CAP-363-22 CAP-363-22
CR111 Lakeshore Road Rehabilitation CAP-111-24 FA-111-24, PIN 5757.49 Lakeshore Road, Town of Evans NY PEDESTRIAN WALKWAY CONSTRUCTION, DRAINAGE IMPROVEMENTS, AND ROAD REHABILITATION OF LAKE SHORE ROAD (CR 111), 1.22 MI.
Dona Street Extension DEP-DONA-18 2029048.5 Zoladz
Elmwood Avenue Pedestrian Bicycle Improvements Project 5761.03 Village of Kenmore Streetscape and Mobility Enhacements
Genesee Road and Sibley Road Safety Improvements FA-30.49.197.409.432-18, PIN 5760.99 Town of Concord Intersection Improvements 524880 Nova Site
Goodrich Road Reconstruction CAP 216-17 Goodrich Road Reconstruction 5070210.85 CATCO
Lakeshore Shoreline Trail - Phase III FA-127BP3
Quaker Street Bridge Replacement FA-5762.14, PIN 5762.14 Bridge Replacement 1398999.99 CATCO
Reconstruction of Kenmore Avenue (CR 189) CAP-189-21 CAP-189-21 Kenmore Ave Highway reconstruction including full depth reconstruction, concrete gutter, concrete curb, closed drainage, sign replacement, and pavement.
Reconstruction of Pine Street (CR 6) CAP-006-24 CAP-006-24
Reconstruction of Sanders Hill Road Bridge over Hunter Creek CAP-BR393-01-24 CAP-BR393-01-24
REHABILITATION OF ABBOTT ROAD (C.R. 4) AND WILLETT ROAD (C.R. 187) CAP-004.187-22 CAP-004.187-22
Rehabilitation of Borden Rd (CR 322) Phase 2 CAP 322-24 CAP 322-24
Rehabilitation of Bullis Road (C.R. 330), Town of Marilla NY CAP-001.330-23 CAP-001.330-23 Bullis Road (C.R. 330), Town of Marilla, NY Roadway rehabilitation (3½” mill and overlay) of Bullis Road (C.R. 330) from Two Rod Road (NYS Route 954G) to Little Buffalo Creek, including replacement of enclosed drainage system, waterline modifications, concrete gutters, driveway aprons, curb ramps,
Rehabilitation of Clarksburg Road Bridge (BR 715) over South Branch Eighteen Mile Creek (BIN 3327890) CAP-BR715-23 CAP-BR715-23
Rehabilitation of Maryvale Drive (CR 194) CAP-194-24 CAP-194-24
Rehabilitation of New Road (CR 186) & Drainage Improvements CAP-186-22 CAP-186-22
Rehabilitation of Trevett Road (CR 420) CAP-420-23 CAP-420-23
Rehabilitation of Vermont Street (CR 226) CAP-226-23 CAP-226-23
Replacement of Culverts – 2022 Culvert Group 1 CAP-CUL-2022 CAP-CUL-2022 Culvert Replacement including new concrete box, and S.I.C.P.P. culvert, concrete work, backfilling, pavement replacement, and guide rail replacements.
Replacement of Ellicott Creek Park Pedestrian Bridge BR-PK-7-2018 Ellicott Creek Park Pedestrian Bridge Replacement 220495.8 CATCO
REPLACEMENT OF THE HEISE ROAD BRIDGE 283-1 OVER RANSOM CREEK BR 283-1-18 748616.75 Union Concrete Construction Corp.
Slide Remediation of Belscher Road CAP-CR419-2018 461485.5 D & H
Stony Road Bridge and Culvert Replacement PIN 5759.95 Stony Road Bridge and Culvert Replacement 1621556.5 Hunting Valley Construction
Tonawanda Rails to Trails Extension - Phase II, State Street to East Niagara Street TAP-TR2TX-17, PIN 5761.02 City of Tonawanda 1462264 Edbauer
Warner Hill Road Culvert Replacement BNY-390-1A-18, PIN 5762.22 331808.5 J. Bognar