Bennett Beach Capital Improvements

2012 - 2024 Capital Improvements:

Project Name Type of Work Completed Estimated Cost to Complete
Restroom Roof condition poor, electric and plumbing issues. Replaced roof, vinyl siding, plumbing fixtures replaced, and electric services upgraded. $34,614.00
Parking Lot & Roadway Improvements Not formalized, rough areas, not large enough to accommodate a park. Extended size of the parking lot and formalized with two types (sizes) of stone and rolled. Oil & Chipped roadway. $34,909.00
Bathhouse Foundation & Wall Removal Removed remains of the old bathhouse foundation and wall in the middle of the beach. Safety/ Aesthetics. Removed wall and opened up the entire beach while eliminating a long-time hazard and potential safety hazard. $17,440.00
Storage Building Needed a place to store equipment. Built pole barn storage building. $33,202.00
Restroom Remodel General overall condition poor. Complete restroom remodel. $78,366.00
Mobile Office Purchased so staff can report directly to Bennett Beach. $39,944.00
Lifeguard Trailer New Lifeguard Trailer. $8,994.00
Beach Accessibility Mat Improve accessibility to the beach. $16,211.00
Gates Installed two (2) carbon steel gates. $4,980.00
 

TOTAL:

$268,660.00