Wendt Beach Capital Improvements

2012 - 2024 Capital Improvements:

Project Name Type of Work Completed Estimated Cost to Complete
Maintenance Building Siding rotted around the entire base of the building and several areas (holes to be filled). Rotted siding replaced, gutters/leaders installed, new commercial door and painted entire building. $23,471.00
Parking Lot and Roadway Improvements Huge voids/ holes and crumbling in many areas. Blacktop patching in worst areas and oil & chipped entire lot and driveway into park. $42,384.00
Wendt Mansion Study Building in obvious need of repair but no estimate or plan. A consultant was hired to evaluate overall current conditions and cost to refurbish using today’s codes/cost. $24,000.00
Building Renovations & Waterline Upgrades Facilities inadequate and not meeting existing & future needs. Turning the block building into a new lifeguard reporting area, storage area, office space, and restroom facility. $214,900.00
Hot Box required by Erie County Water Authority Water service into the park were upgraded, and a hot box was needed for a backflow preventer. Hotbox installed and connections put in at Old Lakeshore Road instead of through the park. $70,943.00
Electrical Upgrade- Residence Problem/ Safety issue with electrical panel. The old-style glass fuse panel was replaced with a new panel. $1,526.00
New Waterline Improper waterline was in place. New, correct waterline run to the residence. $73,424.00
Log Cabin Demolition Building in disrepair, safety hazard to the public. $5,192.00
Wendt Residence Demolition as per BID/RFP $66,593.00
Parking Lot  and Roadway Improvements Roadway/parking lot paving  & improvements $1,600,000.00
 

TOTAL:

$2,122,433.00